The Mornington Centre is a substantial former school complex arranged across several interconnected buildings, constructed predominantly in yellow London stock brick with later C20 alterations and extensions. The buildings had been subject to intermittent occupation and a prolonged period of reduced maintenance, particularly at high level, which had contributed to a range of defects becoming established.
Six Heritage adopted a holistic building pathology approach, combining visual inspection with targeted intrusive investigations, thermographic surveying, moisture measurement, drone inspection and laboratory testing of masonry samples. The aim was to identify both active and latent defects that could present risk to the historic fabric and future use of the site.
The survey identified that, while large areas of the complex remained fundamentally robust, chronic water ingress arising from failed flat roof finishes, blocked rainwater goods and poor ground surface drainage had resulted in localised but significant material decay. Of particular concern were corroded steel elements beneath defective flat roofs, spalling concrete soffits, and vulnerable embedded timber elements subjected to prolonged damp conditions. These findings are summarised in the executive overview of the survey.